The Ministry of Electricity, Water, and Renewable Energy announces that coordination has been made with the General Authority for Roads and Transport and the Water Projects Sector, to implement connection work to the water network on Friday, 03/08/2024, from (8:00 PM) for a period of (10) hours. Insulation to carry out connection work in weak water during the mentioned work period in the following areas (Al-Zahraa, Al-Siddiq).